Sohar 2 – Al Batinah Power Company

Sohar 2 – Al Batinah Power Company
  • Sohar 2 - Al Batinah Power Company
  • 736.5 MW

    Total capacity
  • Sohar 2 - Al Batinah Power Company
  • 15

    PPA duration

Overview

Sohar 2 is a high‑efficiency, gas‑fired combined‑cycle (CCGT) power plant supplying electricity to Oman’s national grid. Operating under a regulated framework, the facility provides stable, reliable generation that supports demand growth and strengthens system resilience.

Commissioned in 2018, Sohar 2 adds modern, large‑scale CCGT capacity to Oman’s power sector, enhancing overall fleet efficiency through advanced turbine technology and lower-emission gas‑based generation — reinforcing its role as a key pillar in the country’s energy infrastructure.

Project Info

  • Technologies Used

    Combined cycle gas turbine (CCGT)

  • Installed Capacity

    736.5 MW

  • Location

    Sohar, Sultanate of Oman

  • Project Completion Year

    2018 ext. 2028

  • Status

    Operational

  • Developers:

    ENGIE, Bahwan, Sojitz, Yonden, SPF, Public

  • Operations & Maintenance:

    Suez Tractebel Operation & Maintenance Oman (STOMO)

Key Impact:

  • Grid stability: Supports national power availability and reliability.
  • High‑efficiency generation: Delivers efficient gas‑fired electricity production.
  • Long‑term infrastructure: Contributes to Oman’s sustainable energy system.